-- card: 113890 from stack: in -- bmap block id: 0 -- flags: 0000 -- background id: 64774 -- name: Moving -- part 1 (field) -- low flags: 01 -- high flags: 0000 -- rect: left=11 top=57 right=163 bottom=233 -- title width / last selected line: 0 -- icon id / first selected line: 0 / 0 -- text alignment: 0 -- font id: 3 -- text size: 10 -- style flags: 0 -- line height: 13 -- part name: textField1 -- part 5 (field) -- low flags: 01 -- high flags: 0000 -- rect: left=238 top=57 right=72 bottom=460 -- title width / last selected line: 0 -- icon id / first selected line: 0 / 0 -- text alignment: 0 -- font id: 3 -- text size: 10 -- style flags: 256 -- line height: 13 -- part name: subhead -- part 7 (field) -- low flags: 01 -- high flags: 0000 -- rect: left=238 top=212 right=240 bottom=460 -- title width / last selected line: 0 -- icon id / first selected line: 0 / 0 -- text alignment: 0 -- font id: 3 -- text size: 10 -- style flags: 256 -- line height: 13 -- part name: subhead -- part 8 (field) -- low flags: 01 -- high flags: 0000 -- rect: left=238 top=214 right=256 bottom=462 -- title width / last selected line: 0 -- icon id / first selected line: 0 / 0 -- text alignment: 0 -- font id: 3 -- text size: 10 -- style flags: 0 -- line height: 13 -- part name: textField1 -- part contents for background part 31 ----- text ----- Working with Subprojects -- part contents for background part 32 ----- text ----- Moving Between Supertasks & Subprojects -- part contents for card part 1 ----- text ----- Once you have linked a task to a subproject,you can easily move back and forth between the subproject and the master project. You can move to a subproject while in the Schedule Chart, Task Timeline, Resource Timeline, Project Table, or Task Cost Entry Table. -- part contents for background part 7 ----- text ----- Select the supertask linked to the subproject you want to move to. Choose Go to Subproject from the Task menu. In the Schedule Chart or a timeline chart, you can also hold down the Command key while double-clicking the supertask to go to a subproject. -- part contents for card part 5 ----- text ----- To go to a subproject: -- part contents for background part 28 ----- text ----- 1. 2. -- part contents for card part 7 ----- text ----- To return to the supertask: -- part contents for card part 8 ----- text ----- Choose Return to Supertask from the Task menu.